PriceLeaf

Daily Mineral Complex

What do I quote this job at, and where is my floor?

Formula

4 ingredients
Capsule fill0.86 of 0.95 ml (90%)
IngredientPer servingUnitAssayOverage$/kgLot minWeighed out
1.43 g476.19 mg each
22 mg7.33 mg each
11 mg3.67 mg each
75 mg25 mg each

The run

What you order and how it gets made

Packaging

Conversion and quality

Nothing physically or commercially impossible in this formula. That is not the same as being ready to sell, but it is a real starting point.

Cost to make, per bottle

$3.41

$0.114 per serving. $17,027 for the whole run of 5,000.

Lead time
10 weeks
Fill weight
512.19 mg each
Raw materials$1.6147%
Delivery format$0.82824%
Packaging$0.36911%
Conversion$0.43013%
Quality$0.1705%
LinePer bottlePer run
Raw materials4 ingredients at 3 percent yield loss$1.50$7,485
Lot minimum overbuy4 materials sold in lots larger than this run needs$0.111$555
Capsule shells90 x Size 00 (most common)$0.828$4,140
Container275cc HDPE round$0.246$1,230
Closure45/400 ribbed, foam liner$0.046$230
LabelWhite BOPP, 4 colour$0.073$365
Tamper-evident neckbandTamper evidence$0.0044$22.00
Filling and packingCapsules line rate$0.360$1,800
Run setup and changeover$350 once, spread over 5,000 units$0.070$350
Testing and release$850 per batch, spread over 5,000 units$0.170$850
Total$3.41$17,027

Of $3.41, $0.240 is fixed cost spread over this run and $3.17 moves with every extra bottle. A green dot is a reference band, amber is typical trade practice, grey is a number you entered.

I make things

Contract manufacturers and private-label plants

Quote per unit

$6.36

at 40% margin

Loaded cost

$3.81

$3.41 direct plus $0.409 overhead

Gross on the run

$12,713

on $31,784 of revenue

Walk-away price

$3.17

Below this the run does not cover its own variable cost

Tier sheet

Every tier held at 40% margin
QuantityYour costQuoteOrder valueYour grossLead
2,500$4.44$7.40$18,510$7,40410 weeks
5,000this run$3.81$6.36$31,784$12,71310 weeks
10,000$3.63$6.06$60,551$24,22010 weeks
25,000$3.47$5.78$144,583$57,83311 weeks
50,000$3.37$5.62$281,102$112,44112 weeks

Each row is a full recompute, not a discount applied to the row above. Lot minimums, setup and testing all move the way they really would, which is why the curve is steep at the bottom and nearly flat at the top.